Brisbane City Council is developing a detailed design for the Bridgeman and Beckett Road Corridor Upgrade, between Saturn Crescent/Casuarina Street and Linkfield Road, Bridgeman Downs.

Background

The Bridgeman and Beckett Road Corridor Upgrade is part of Lord Mayor Campbell Newman’s Road Action Program, which tackles congestion and improves safety on Brisbane’s 21 worst congested roads.

The Bridgeman Road/Beckett Road corridor is a major link between the northern suburbs of Bridgeman Downs, Bald Hills, Carseldine and beyond.  At present, the road between Linkfield Road and Saturn Crescent/Casuarina Street is reaching capacity. 

This project aims to reduce traffic congestion in the local area, improve safety and meet future demands as the area’s population continues to grow.

 

Project Details

The Bridgeman and Beckett Road Corridor Upgrade consists of three upgrades:

1) Bridgeman Road Stage 1 (Linkfield Road to Beams Road)

2) Bridgeman Road Stage 2 (Beams Road to Graham Road)

3) Beckett Road widening (Graham Road to Saturn Crescent/ Casuarina Street).

Council will upgrade each existing two-lane section to a four-lane arterial-standard road with the additional features listed outlined below.

Bridgeman Road Stage 1

The Bridgeman Road Stage 1 upgrade will include:

  • widening the current road to four lanes (two lanes in each direction) with a centre median strip
  • on-road bicycle lanes in each direction
  • the provision of u-turn facilities
  • signalised pedestrian crossings at all intersections to allow people to cross safely
  • footpath improvements and landscaping
  • improved street lighting
  • installing traffic signals at the three intersections along this stretch of road at:
  • Beams Road and Bridgeman Road
  • Bridgeman Road and Roghan Road
  • Roghan Road and Carseldine Road.

Bridgeman Road Stage 2 and Beckett Road widening

The Bridgeman Road Stage 2 and Beckett Road widening part of the upgrade will include:

  • a new four-lane road with a centre median strip to safely separate traffic in each direction
  • on-road bicycle lanes in each direction
  • footpath improvements and landscaping
  • installing traffic signals at the two intersections along this stretch of road at:
  • Beckett Road and Darien Street
  • Beckett Road, Bridgeman Road and Graham Road.
  • improved street lighting
  • signalised pedestrian crossings at all Council-controlled intersections (excluding the intersection of Beckett Road and Endell Street).

More information

For more information on the Bridgeman and Beckett Road Corridor Upgrade project:

  • view the newsletter
  • call the project team on 1800 550 712 (during business hours)
  • call Council on (07) 3403 8888 (24 hours)
  • email: roadactionprogram@brisbane.qld.gov.au
  • fax:  (07) 3026 7575 (Attention: RAP Project: Bridgeman Road Transport Corridor
  • write to

Bridgeman Road Transport Corridor Project

Brisbane City Council

Transport Infrastructure Delivery LLT

GPO Box 1434

Brisbane Qld 4001